Product

case

Home > case

Fuzhou metro base flood control

Time:2024/9/10 14:23:21

Fuzhou Metro overhaul base flood control renovation, for the seal of the track using composite material custom size, flood control height of 5.4 meters, closely cooperate with local service providers to complete the measurement, construction, installation and acceptance of a series of processes, successfully passed the owner and design supervision unit acceptance!