Fuzhou metro base flood control
Time:2024/9/10 14:23:21
Fuzhou Metro overhaul base flood control renovation, for the seal of the track using composite material custom size, flood control height of 5.4 meters, closely cooperate with local service providers to complete the measurement, construction, installation and acceptance of a series of processes, successfully passed the owner and design supervision unit acceptance!
Contact
TEL
0510-83880031
Company:Jiangsu Yongjing Water Conservancy Technology Co., Ltd
ADD:Donghuan Road, Yuqi Street, Huishan District, Wuxi
Recommended
- How to choose the material of the wat…
- Is it safe to block water with waterp…
- The design of flood protection baffle…
- Introduction of flood protection baff…
- Fight fireworks help Hangzhou Jiuxi f…
- Preparations for flood control and fl…
- The advantages of flood control artif…
- Classification of flood control artif…