China Huaneng Group
Time:2024/9/10 14:35:22
Huaneng GroupThe flood control project of the hydropower station under Sichuan Hydropower Company of Huaneng Group adopts two ways of flood control sealed door and fabricated aluminum alloy flood control wall.
Contact
TEL
0510-83880031
Company:Jiangsu Yongjing Water Conservancy Technology Co., Ltd
ADD:Donghuan Road, Yuqi Street, Huishan District, Wuxi
Recommended
- How to choose the material of the wat…
- Is it safe to block water with waterp…
- The design of flood protection baffle…
- Introduction of flood protection baff…
- Fight fireworks help Hangzhou Jiuxi f…
- Preparations for flood control and fl…
- The advantages of flood control artif…
- Classification of flood control artif…