Liaoning around Yang project
Time:2024/9/10 14:47:53
Liaoning Rouyang project is the use of prefabricated aluminum alloy flood wall, fixed embedded parts welded base structure, has been installed, smooth acceptance.
Contact
TEL
0510-83880031
Company:Jiangsu Yongjing Water Conservancy Technology Co., Ltd
ADD:Donghuan Road, Yuqi Street, Huishan District, Wuxi
Recommended
- How to choose the material of the wat…
- Is it safe to block water with waterp…
- The design of flood protection baffle…
- Introduction of flood protection baff…
- Fight fireworks help Hangzhou Jiuxi f…
- Preparations for flood control and fl…
- The advantages of flood control artif…
- Classification of flood control artif…