Liuzhou Zhegu River project
Time:2024/9/10 14:52:15
According to the actual situation of the project, the fabricated aluminum alloy flood control wall is used, and the crossing height is 0.6 to 1.4 meters. The production and installation are completed and the acceptance is smooth.
Contact
TEL
0510-83880031
Company:Jiangsu Yongjing Water Conservancy Technology Co., Ltd
ADD:Donghuan Road, Yuqi Street, Huishan District, Wuxi