Liuzhou Zhegu River project

Time:2024/9/10 14:52:15

According to the actual situation of the project, the fabricated aluminum alloy flood control wall is used, and the crossing height is 0.6 to 1.4 meters. The production and installation are completed and the acceptance is smooth.