Wuhan hotel entrance and exit flood prevention
Time:2024/9/10 16:02:26
Wuhan hotel gate entrance and exit flood control renovation, the use of heavy flood baffle, water blocking height of 1.2 meters, foundation pit embedded way, professional and technical personnel on-site service installation guidance, 2 days to complete the installation successfully passed the acceptance!
Contact
TEL
0510-83880031
Company:Jiangsu Yongjing Water Conservancy Technology Co., Ltd
ADD:Donghuan Road, Yuqi Street, Huishan District, Wuxi
Recommended
- How to choose the material of the wat…
- Is it safe to block water with waterp…
- The design of flood protection baffle…
- Introduction of flood protection baff…
- Fight fireworks help Hangzhou Jiuxi f…
- Preparations for flood control and fl…
- The advantages of flood control artif…
- Classification of flood control artif…