Product

case

Home > case

Wuhan south eleven flood control project

Time:2024/9/10 16:06:17

Wuhan South 11 flood control project, the use of medium baffles series, installed in the middle of the river, daily demolition installed water storage, water blocking height of 2 meters, smooth acceptance!