Product

case

Home > case

Wuhan Ring Highway

Time:2024/9/10 16:22:40

Wuhan high-speed maintenance unit adopts the assembled flood control wall scheme in the high-speed low-lying area, blocking the surrounding drainage in flood season, ensuring the normal high-speed traffic, dismantling in non-flood season, and not affecting the scenery along the high-speed road. Use 200*100*3mm heavy flood control baffle system. Successfully passed the joint acceptance of the owners, construction units, supervisors, design units and other departments!